Brenner Base Tunnel: Facts, Travel Time and Construction Timeline
Once the Brenner Basistunnel construction is completed, it will cut train travel time even shorter. Right now, travel time from Innsbruck in Austria, Tyrol, all the way across the Alps to Franzensfeste in South Tyrol, Italy, takes 80 minutes. Once the Brenner Base Tunnel is completed, this journey will only take 25 minutes. With a length of 55 km, it will be the second-longest tunnel in the world, after the 57 km long Gotthard Base Tunnel in Switzerland. The Diameter of each of the single-track tubes will be 8.1 m, with a partial maximum overburden of 1,6 km. What a crazy construction Galleria di base del Brennero is – and I can’t wait to travel and experience it! After first preparations started in 1999, the end of constructions is scheduled as of 2025, with an operational start in 2026. Up from then around 200 to 250 trains will use the Brenner Base Tunnel, each travelling at a speed of 250 km/h for passenger trains, and 160 km/h for freight trains.
Seeing the Brenner Base Tunnel Construction Sites near Franzensfeste
On my recent trip from Innsbruck to South Tyrol, I have crossed some visible construction sites of the Brenner Base Tunnel project, near Franzensfeste in Italy.


Planning your own journey? Read how to take the train from Innsbruck to Brixen, check how far Brixen is from Innsbruck and browse more on Train Travel, Train Travel in Austria, Train Travel in Italy, Innsbruck, Franzensfeste and South Tyrol. More regional stories are in our Italy category.
FAQ: Brenner Base Tunnel
How long is the Brenner Base Tunnel?
With a length of about 55 km, it is planned to be the second-longest railway tunnel in the world, after the 57 km Gotthard Base Tunnel in Switzerland.
How much faster will the train from Innsbruck to Franzensfeste be?
Today the journey from Innsbruck to Franzensfeste takes around 80 minutes. Once the tunnel is completed, it should take only about 25 minutes.
When will the Brenner Base Tunnel open?
Preparations began in 1999. At the time of writing, completion was scheduled for 2025 with the operational start in 2026, but such mega projects can change, so check current information from the project operators before planning your trip.
How fast will trains run in the tunnel?
Passenger trains are planned to travel at up to 250 km/h and freight trains at up to 160 km/h, with roughly 200 to 250 trains using the tunnel.
Where can I see the construction of the Brenner Base Tunnel?
On my trip from Innsbruck to South Tyrol I passed visible construction sites near Franzensfeste in Italy.